This shows you the differences between two versions of the page.
nordic_campaign_reports [2015/02/27 10:03] 0.0.0.0 created |
— (current) | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Nordic_Campaign_REPORTS ====== | ||
- | ==== Södankyla 2011 ==== | ||
- | The Arctic aspect of CEOS Intercalibration of Ground-Based Spectrometers and Lidars took place at Sodankylä during the period March 8 to 23, 2011. Participation consisted of two Dobson and five Brewers teams. Unfortunately, DMI instrument (<nowiki>Brewer#053</nowiki>), operated by Paul Eriksen, was not operative for the whole intercomparison period, due transport problems. | ||
- | <br><br> | ||
- | [[http://www.iberonesia.net/archives/reports/SDK2011/Nordic_FMI_CalibrationCheckList.pdf|Here]] you can find the main results of calibration work (//Calibration Checklist//), whereas extense reports of the same nature can be found linked below. Additionally, a Second Progress Report of ESA - CEOS project highlighting the main results of current intercomparison campaign can be found [[http://www.iberonesia.net/archives/reports/ESA/CEOS-InterCal_PR02_ScienceOverview_v1.1.pdf|Here]]. | ||
- | |||
- | <br> | ||
- | |||
- | {| width="200" cellspacing="1" cellpadding="1" border="1" align="center" style="" | ||
- | |+ SODANKYLA 2011<br>calibration reports | ||
- | |- | ||
- | | [[http://www.iberonesia.net/archives/reports/SDK2011/CALIBRATION_006.pdf|Brewer #006]] | ||
- | |- | ||
- | | [[http://www.iberonesia.net/archives/reports/SDK2011/CALIBRATION_037.pdf|Brewer #037]] | ||
- | |- | ||
- | | [[http://www.iberonesia.net/archives/reports/SDK2011/CALIBRATION_107.pdf|Brewer #107]] | ||
- | |} | ||
- | <br> | ||
- | |||
- | [[Category:Reports]] [[Category:Development]] |