codes:errorbudget
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| codes:errorbudget [2022/10/20 07:55] – external edit 127.0.0.1 | codes:errorbudget [2024/03/22 13:31] (current) – [Introduction] jlsolano | ||
|---|---|---|---|
| Line 17: | Line 17: | ||
| - | In this document we present the uncertainty estimation of the total ozone measured by the Brewer spectrophotometers focusing on the instrumental parameters. The uncertainty model was developed during the ATMOZ project. This model describe the uncertainty model reference instruments: | + | In this document we present the uncertainty estimation of the total ozone measured by the Brewer spectrophotometers focusing on the instrumental parameters. The uncertainty model was developed during the ATMOZ project. This model describe the uncertainty model reference instruments: |
| On this report we summarize the developments of the first step which is focused on the instrumental parameters that affect the model, considering the Langley calibration and the calibration transfer to the network instruments. | On this report we summarize the developments of the first step which is focused on the instrumental parameters that affect the model, considering the Langley calibration and the calibration transfer to the network instruments. | ||
codes/errorbudget.1666252543.txt.gz · Last modified: 2024/03/22 13:31 (external edit)